Deliver to Vanuatu
IFor best experience Get the App
AQUAPROAqua Pro 69717 9 1/2" Long Lead Free Magnesium Anode Rod with 3/4" Male Pipe Thread
Size | Small |
Material | Lead,Magnesium |
Brand | Aquapro |
Color | Aqua |
Item dimensions L x W x H | 9.2 x 0.9 x 0.7 inches |
Connector Type | Threaded |
Exterior Finish | Magnesium |
Thread Type | NPT |
Item Weight | 0.37 Pounds |
Global Trade Identification Number | 00088805697175 |
Manufacturer | Aqua Pro |
UPC | 088805697175 |
Model | 69717 |
Item Weight | 5.9 ounces |
Product Dimensions | 9.2 x 0.9 x 0.7 inches |
Country of Origin | China |
Item model number | 69717 |
Is Discontinued By Manufacturer | No |
Manufacturer Part Number | 69717 |
Trustpilot
1 month ago
2 days ago